What is a housing subdivision

Selling land split into 10 or more plots, whether from one plot or several adjoining plots, requires a subdivision permit first. The project must provide utilities such as roads, water and electricity, and common areas of at least 5% of the saleable area.

Scope of work

  1. Advice throughout the project, or full management on the owner's behalf
  2. Boundary survey of the project land and a layout that maximises saleable area
  3. Utility design, drainage calculations and construction cost estimates
  4. Permit documents with layouts certified by a licensed architect and civil engineer
  5. Filing with the Land Office and other agencies, and follow-up until the permit is issued
  6. Subdivision into individual title deeds after approval

Minimum plot sizes by house type

TypeRequirement
Detached houseWidth and depth at least 10 m and area at least 50 sq. wah (60 sq. wah if either side is shorter). The house must be at least 2 m from every boundary
Semi-detached houseWidth and depth at least 8 m and area at least 35 sq. wah. At least 2 m from the non-shared boundaries and a 3 m front setback
TownhouseFrontage at least 4 m and area at least 16 sq. wah. 3 m front setback, 2 m from the rear boundary, and spacing between buildings as required by building control law

Requirements can differ according to each provincial land subdivision committee.

Advertising land for sale as a subdivision before the permit is issued is prohibited. Read the land clinic answer on this